Skip to content
SOAVM Tech logo

Infrastructure & Platform as a Service

Aplatformprovenonourownproductionestatebeforeyours.

We build and run multi-tenant orchestration, serverless hosting, managed databases and event backbones.

  • Multi-tenant Orchestration
  • Serverless Hosting
  • Managed Databases
  • Managed Event Backbones
  • Multi-tenant Orchestration
  • Serverless Hosting
  • Managed Databases
  • Managed Event Backbones
  • Multi-tenant Orchestration
  • Serverless Hosting
  • Managed Databases
  • Managed Event Backbones

Who this is for

The situation that makes this urgent

The mandate and boundaries below come directly from the approved service catalogue.

Three ways to engage

Assess, Transform, Operate

Each package has a defined duration, retained outputs, commercial model and objective exit criterion.

  1. Assess

    Platform fit and onboarding baseline.

    Duration
    2 weeks fixed
    What you keep
    Workload profile, residency, dependencies, egress, quota sizing and explicit exceptions
    Commercial model
    Fixed price
    Exit criterion
    Client accepts fit analysis
  2. Transform

    Tenancy onboarding and workload landing.

    Duration
    4 weeks – 6 months
    What you keep
    Isolation, quotas, golden paths, migration, residency pinning and validation
    Commercial model
    Milestone-billed
    Exit criterion
    Isolation passes and SLO holds for one month
  3. Operate

    Platform subscription service.

    Duration
    12 months minimum
    What you keep
    Published SLOs, containment, capacity, notices and quarterly review
    Commercial model
    Monthly by resource, tier and zone
    Exit criterion
    Renewal, transition or offboarding

Capability detail

The technical substance, on the page and not behind a form

The operating capabilities and controls that define this practice.

Technical standard

Requirements that apply to every engagement

Must and should requirements from the board-approved practice standard, made visible before a conversation.

  1. Enforce tenant isolation across compute, network, storage and identity simultaneously.

  2. Apply automatic per-tenant quotas and proactive saturation alerts.

  3. Enforce residency through region pinning and egress controls.

  4. Provide independent encryption-key management for each tenant.

  5. Publish machine-readable SLO, quota, region, deprecation and notice definitions.

  6. Give 90 days' notice of breaking changes and 12 months for deprecation.

  7. Continuously attempt cross-tenant access; any success is a Severity One incident.

  8. Provide self-service golden paths with controls already configured.

  9. Publish historical SLO attainment to tenants on a shared status page.

  10. Hold capacity to absorb one availability-zone failure at peak load.

Engagement gates: Discover and Design passed, Deliver in progress, Operate upcoming

How we work

Four phases. Objective exit criteria.

A gate passed on assertion has not been passed. One exit criterion per gate is shown here; the full set sits on each practice page.

  • Discover

    Workload profile, dependency map and recovery objectives written down and signed off by the client owner.
  • Design

    Target architecture reviewed against the vendor-supported pattern for the engine in question; failure modes enumerated.
  • Deliver

    Recovery tested from backup within the stated RTO, evidenced by a timestamped test record.
  • Operate

    Runbooks in place, rota published, first quarterly service review held with measured figures.

The boundary

What we do not do

A capability list without explicit limits is only marketing.

  1. Availability gate

    External service requires two consecutive successful internal-production quarters; only the board may waive it.

  2. Out of scope

    No bare-metal resale, physical hosting, hardware leasing or unmoderated public signup.

  3. No forks

    Tenants receive configuration and quota variation, never bespoke platform code paths.

Evidence

The artefacts that make the claim testable

Evidence replaces unqualified promises and unattributed metrics.

Get started

A platform-fit baseline names what belongs on the platform, what does not, and the controls required before landing.

You keep the written baseline whether or not we continue together.