Skip to content
SOAVM Tech logo

Cloud & Infrastructure Engineering

Infrastructurethatcanberebuiltfromsourceandrecoveredundertest.

We design, build and operate multi-cloud and hybrid compute, network, storage and identity estates. Infrastructure is a program: if a resource cannot be recreated from version control, it does not exist.

  • Azure
  • AWS
  • GCP
  • Azure
  • AWS
  • GCP
  • Azure
  • AWS
  • GCP
  • Azure
  • AWS
  • GCP

Who this is for

The situation that makes this urgent

The mandate and boundaries below come directly from the approved service catalogue.

Three ways to engage

Assess, Transform, Operate

Each package has a defined duration, retained outputs, commercial model and objective exit criterion.

  1. Assess

    Cloud estate and resilience baseline.

    Duration
    2 weeks and 3 multi-cloud
    What you keep
    Inventory, drift, cost, utilisation, recovery measurement and FinOps opportunities
    Commercial model
    Fixed price
    Exit criterion
    Client accepts baseline and roadmap
  2. Transform

    Landing zone, migration and resilience build.

    Duration
    8 weeks – 9 months
    What you keep
    Infrastructure as code, network and identity design, migration, drift detection, recovery simulation
    Commercial model
    Milestone-billed
    Exit criterion
    Recovery proven and zero unmanaged resources
  3. Operate

    Managed cloud and infrastructure.

    Duration
    12-month minimum
    What you keep
    24-hour coverage, coded change, SLOs, recovery exercises and optimisation
    Commercial model
    Monthly by estate and tier
    Exit criterion
    Renewal, transition or decommission

Capability detail

The technical substance, on the page and not behind a form

The operating capabilities and controls that define this practice.

Technical standard

Requirements that apply to every engagement

Must and should requirements from the board-approved practice standard, made visible before a conversation.

  1. Provision and modify every environment through declarative infrastructure as code.

  2. Continuously detect drift and safely revert unauthorised change.

  3. Keep immutable backups cryptographically isolated from production credentials and test restores.

  4. Prove recovery objectives annually for Tier 1 and every 18 months for Tier 2.

  5. Enforce cost-centre tags and non-production schedules at merge time.

  6. Separate environments with network segmentation and least-privilege identity.

  7. Classify every environment by SLO tier at Design.

  8. Keep managed platforms within one minor supported version or publish a dated exception.

  9. Report committed, on-demand, wasted, eliminated and forecast spend monthly.

  10. Rehearse Tier 1 failover, including human decisions, at least twice yearly.

Engagement gates: Discover and Design passed, Deliver in progress, Operate upcoming

How we work

Four phases. Objective exit criteria.

A gate passed on assertion has not been passed. One exit criterion per gate is shown here; the full set sits on each practice page.

  • Discover

    Workload profile, dependency map and recovery objectives written down and signed off by the client owner.
  • Design

    Target architecture reviewed against the vendor-supported pattern for the engine in question; failure modes enumerated.
  • Deliver

    Recovery tested from backup within the stated RTO, evidenced by a timestamped test record.
  • Operate

    Runbooks in place, rota published, first quarterly service review held with measured figures.

The boundary

What we do not do

A capability list without explicit limits is only marketing.

  1. Physical layer

    No data-centre construction, cabling, power, cooling or hardware break-fix.

  2. End users

    No device management, corporate helpdesk or desktop support.

  3. Carriers

    We define and manage connectivity requirements but do not sell circuits.

Evidence

The artefacts that make the claim testable

Evidence replaces unqualified promises and unattributed metrics.

Get started

A cloud estate baseline measures drift, recovery and cost before a migration or operating commitment is made.

You keep the written baseline whether or not we continue together.